Monitoring the implementation of mandatory constraining environmental measures for birds in the new/upgraded powerlines Carrapatelo–Estarreja 3 and Carrapatelo–Estarreja 2/Carrapatelo–Mourisca (220 kV)

Monitoring the implementation of mandatory constraining environmental measures for birds in the new/upgraded powerlines Carrapatelo–Estarreja 3 and Carrapatelo–Estarreja 2/Carrapatelo–Mourisca (220 kV)

The purpose of this project was to monitor the implementation of the constraining environmental measures directed to threatened bird species breeding, or potentially breeding, in the area of construction of the powerline. It was found that only two of the five potential species actually bred or remained in the area throughout the breeding period, in specific parts of the powerline corridor. The result of this survey led to the construction being stopped in those places until it was confirmed that the mentioned species had ceased their breeding and/or had left for their winter quarters in late September.

Team
Principal Investigator
Pedro Beja

Pedro Beja

Position: Associate Director of Operations, Fund Raising and Knowledge Transfer
View
Technical Staff
Tiago Ferrand Almeida Múrias dos Santos

Tiago Ferrand Almeida Múrias dos Santos

Position: Research Technician
Group:
APPLECOL
View
Other members
Júlio Daniel Santos (Collaborator)
State
Concluded
Proponent Institution
Centro de Biodiversidade e Recursos Genéticos, Laboratório Associado (CIBIO-InBIO)
Funded by
REN - Redes Energéticas Nacionais
Dates
2014
Participant Institutions
Instituto de Ciências e Tecnologias Agrárias e Agro-Alimentares - Porto (ICETA-Porto/UP)