Mónia Nakamura
PhD Student
Contracts
1 Contracts
Monitoring the implementation of mandatory constraining environmental measures for the Iberian Wolf in the new powerline Vieira do Minho-Pedralva (1400 kV) and Posto de Corte de Vieira do Minho (400 kV)
PI: Pedro Beja